







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Home Additions & ADU: The Downey Owner’s Guide
We build KraftMaid-compatible home additions and ADU shells in Downey, with finished living space in the $45,000 – $130,000 range for a home addition and $90,000 – $220,000 for a detached or attached ADU. Every project is quoted upfront with a fixed number and backed by our 730-Day Done Right Promise.

Downey owners usually don’t come to us at the “signs of failure” stage – additions aren’t like a cabinet hinge. They call when the thing already went sideways: an unpermitted addition the county red-tagged, a 1960s bonus room framed onto the back of the house with a flat roof that’s been leaking through the drywall every El Niño, or a “garage conversion” the previous owner did themselves with a single 2×4 header where a proper beam should be. That’s the moment the question changes from “what’s the cost” to “what’s actually behind the drywall.”
Which KraftMaid Models This Applies To

KraftMaid doesn’t make additions – they make cabinets and vanities. Where we spec KraftMaid into an addition or ADU is in the secondary spaces: an ADU kitchenette, a guest-suite vanity, a bar wall in a bonus room. The relevant lines are KraftMaid Vantage (the builder-grade series), KraftMaid Essence (mid-tier, painted finishes), and the full KraftMaid line with its door-style catalog. Each series has different cabinet box depths and drawer-glide specs, so what we install in an ADU kitchenette – typically a 24-inch-deep base and a compact wall cabinet stack – usually won’t match what’s already in your main house kitchen.
To identify what you’re working with, look for the KraftMaid brand mark stamped on the cabinet’s interior side or the back panel, and note the door style name printed on a sticker inside the cabinet door. If those are gone, measure the cabinet depth and the drawer-box width, and photograph the drawer glide – the glide profile identifies the Vantage vs. full-line chassis in seconds.
For the finished surfaces in additions, we also work with Cambria, Silestone, and Kohler, so the whole ADU spec lands on a single contractor.
Groundwork Construction Co. of Downey is an independent service provider, not affiliated with KraftMaid.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Home Additions & ADU Is Failing
- Soft or spongy flooring near exterior walls. Usually moisture migrating under an improperly flashed addition wall – slab-on-grade Downey homes absorb water through the wall-to-slab joint, and the subfloor and finish flooring are what pay for it.
- Interior drywall cracks running diagonally from corners or window openings. Often the footprint settling unevenly because the original foundation wasn’t pinned to the addition slab.
- Ceiling stains in a flat-roof bonus room. The single-ply or torch-down membrane on a flat addition runs out of life faster in Downey’s summer heat cycling than a pitch roof does – 12 to 15 years is the honest number, not the 20 you’ll hear quoted.
- Doors and windows that stick seasonally. Racking from an underpinned frame, or – more commonly in older Downey stock – a header that was undersized for the span and deflects under load.
- Permit red tag or unpermitted record with the city. A “finished” garage conversion that shows up in city records as an unpermitted use of the space. This is the most expensive sign to fix, and it changes the loan picture on a sale.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s what the work runs in Downey, with the lead range for a full addition at $45,000 – $130,000 and an ADU at $90,000 – $220,000. Garage conversions – the most common entry point – land at $30,000 – $80,000.
| Scope | Downey Installed Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves the number: foundation type (slab-on-grade vs. raised), whether the existing roof has to be cut and reframed into the new footprint, the electrical panel capacity (a 100-amp panel on a 1950s Downey house usually needs upgrading before an ADU carries an EV charger and a full kitchenette), and whether HVAC is extended or the addition gets its own mini-split. Permits and inspections are included – we pull them, we don’t hand you a job folder and wish you luck.
We hold the number, with no change orders for scope we should have caught in the walkthrough. Standard install runs 4 to 7 months for a garage conversion, longer for a detached ADU. KraftMaid and Kohler fixtures are line-itemed separately so you can see cabinet and finish-line costs apart from the framing and MEP.
DIY or Call Us?
What you can safely check yourself: pull the city building permit record on the addition (Downey’s online permit portal is public), photograph the drywall cracks, and check the date stamp on the last roof permit for any flat-roof portion. What you should not attempt: pulling a load-bearing wall, cutting a header, or converting a garage’s electrical and gas service. Those aren’t just risky – they’re the exact items that get flagged by the county inspector and force a tear-out, and a missed permit on an ADU can equal a demand to demolish or substantially rework what’s there.
The honest read: garage conversions and additions sit squarely in the “call a contractor” bucket. Call us at (888) 255-8179 and we’ll walk the space with you, tell you what’s actually behind the drywall, and price the build from there.
FAQs

With normal use, KraftMaid Vantage and Essence cabinet boxes hold up 15 to 20 years; the doors and glides fail first. In Downey’s ADU kitchens – small, hot in summer, heavily used by tenants – expect the under-sink cabinet floor to show water damage in 8 to 10 years if the sink isn’t caulked properly. Call (888) 255-8179 for a free estimate on replacement or rehab.
Sometimes. A failed cabinet door, a drawer glide, a drywall crack, a stuck window – those are repair items, not replacement items. What can’t be repaired in place: a failing flat roof on an addition, an unpermitted structure, or a settled foundation. We’ll tell you which bucket you’re in on the walkthrough, and the estimate is free either way.
Four to seven months from permit issue to move-in, depending on whether the panel needs upgrading and whether HVAC is extended. Detached ADUs run longer – six to nine months is realistic. Your written timeline is set at contract signing, not adjusted mid-job.
We order direct through KraftMaid’s dealer channel, matched to your spec and door style, and layout the cabinets in the addition design so they land on the right wall at the right dimensions. We don’t carry stock, so lead time is included in the build schedule from day one. Call (888) 255-8179 to start your free project estimate and design consult.
Call (888) 255-8179 for your free estimate. Groundwork Construction Co. of Downey answers with a live person around the clock, sends background-checked, uniformed technicians, and backs every project with the 730-Day Done Right Promise. Kitchens, baths, roofs, windows and doors, fences, driveways and pavers, additions and ADUs – from foundation to finish line, built to last and backed in writing. Financing at 0% for 18 months is available, plus $1,000 off projects over $10,000.
Written by the team at Groundwork Construction Co. of Downey, serving Downey and nearby areas.












