Tub-to-Shower Conversion in La Mirada, CA: Cost, Timeline, and What Happens
A tub-to-shower conversion in La Mirada runs $3,500 – $10,000 and takes most homes 5 to 10 working days from demo to final walkthrough. The job means removing the tub, reworking the drain and waterproofing, and setting a new shower pan, walls, valve and glass. Most La Mirada conversions land in the middle of that range because the original 1950s-60s plumbing is worth bringing up to code while the wall is open. Call (888) 255-8179 for a free estimate.
How a Tub-to-Shower Conversion Actually Goes, Stage by Stage

Here’s the real sequence a tub-to-shower conversion follows in La Mirada. Five stages, and you make a decision at each one.
1. Estimate and layout (day 1)
We measure the alcove, check the valve and drain location, and look at what’s behind the existing surround. You decide the shower footprint, the curb height and whether you want a seat. We give you a written line-item quote before anything gets ordered, so the number you see is the number you pay.
2. Demo and rough-in (days 2 – 3)
The tub comes out, along with the old surround and whatever backer is behind it. On La Mirada tract homes this is where we usually find a cast-iron or steel tub on a mortar bed, and sometimes galvanized drain lines that have narrowed. You decide then whether to swap the mixing valve and trim while the wall is open. This is the stage that can add a day if the drain needs rework.
3. Plumbing and inspection (day 3)
We move the drain to the new shower position, set the pan, and connect the valve. This is the point where an inspection, if your scope requires one, happens before walls close. You get a chance to confirm the drain placement and the valve model before we cover it.
4. Waterproofing and tile or panel set (days 4 – 7)
Cement board or a bonded waterproof membrane goes in, then the pan waterproofing, then the wall finish. Tile setting runs two to three days including grout; a panel system can cut a day off. You pick the wall material, tile size and grout color at the estimate, not mid-job.
5. Glass, fixtures and final walkthrough (days 8 – 10)
The showerhead, handle, niche trim and glass door go in. We water-test the pan and check the slope. Then we walk the job with you. Any punch item gets handled under the 730-Day Done Right Promise – if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
What You’ll Choose Between for the Shower Itself
The decisions that shape both the look and the price fall into a handful of real categories. Here’s the honest trade-off on each.
- Acrylic or fiberglass surround – the least expensive route, often $1,200 – $2,500 installed as part of the job. Fast, easy to clean, hides minor wall imperfections. Trade-off: it can look dated in a nicer home and it can’t be repaired invisibly if it cracks.
- Porcelain or ceramic tile – the standard for La Mirada homes in the $9,000 – $15,000 bathroom tier. Lasts decades, comes in any look. Trade-off: grout needs sealing, and the install labor is the bulk of the cost.
- Large-format tile – fewer grout lines, easier upkeep, reads modern. Adds roughly 10 – 20% over standard tile on labor, and the walls have to be flat, which sometimes means extra prep on an old tract-home stud wall.
- Glass enclosure – frameless for a clean line, semi-frameless to save money. Frameless glass typically runs $900 – $1,800 of the total and shows water spots more than a framed unit.
- Shower valve and trim – a basic pressure-balance valve is fine. A thermostatic valve or a rain head adds cost and sometimes needs a larger cartridge opening.
- Bench, niche and curb – a built-in bench or niche adds $300 – $900 depending on the tile. A curbless entry costs more because the floor framing and pan have to change.
We pull from brand partners like Kohler for valves and fixtures, and we’ll steer you toward the material grade that fits the house rather than the one that pads the invoice. If the conversion is part of a larger scope – new flooring or a vanity at the same time – that work belongs under Bathroom Remodeling in La Mirada, which lays out the full project.
What Tub-to-Shower Conversion Costs in La Mirada, CA

In La Mirada, a tub-to-shower conversion typically costs $3,500 to $10,000. Here’s how that range breaks down by line item:
| Line item | Typical La Mirada range |
|---|---|
| Demo and tub removal | $400 – $900 |
| Plumbing rough-in and valve | $700 – $1,800 |
| Shower pan and waterproofing | $600 – $1,500 |
| Wall surround (acrylic or tile) | $1,200 – $3,500 |
| Glass enclosure | $900 – $1,800 |
| Fixtures, trim, permit, cleanup | $400 – $1,200 |
Four things push a La Mirada job toward the low or high end. Size: a standard 60-inch alcove stays low; widening the opening to 72 inches adds framing and tile. Existing condition: hidden rot behind the surround or a failed valve adds labor. Moving plumbing or electrical: shifting the drain is normal, but moving a vent stack or adding a GFCI outlet for a light pushes the number up. Material grade: an acrylic surround and a full porcelain tile job with frameless glass are two very different projects. A written estimate includes the demo, rough-in, waterproofing, wall finish, glass and cleanup – and it excludes structural changes, tile upgrades you add later, and any hidden damage we can’t see until the walls open. We flag those separately so there are no change-order surprises.
See the difference
Before
After
Before
After
Before
AfterWhat La Mirada Homes Themselves Do to This Job
La Mirada was built largely in the 1950s and 60s by the La Mirada Land Company as a planned suburb, and that history is the whole story of a tub-to-shower conversion here. Most of the work happens in the same handful of original tract-home floor plans, so we see the same bathroom layout over and over: a 5-foot alcove tub with a narrow wall and a single valve. When we open a wall in one of these homes, we expect galvanized drain stubs, old mortar-bed tubs, and thin backer that’s been stewing for decades. That’s what shapes the price more than anything you pick out of a showroom. You’ll want a permit when the drain or valve moves, and the city’s inspection process on a small residential job moves fast because the code review is straightforward for a like-for-like alcove. We handle the permit and pass the inspection as part of the job. If you’re also weighing exterior work, homeowners often pair this with Metal Roofing in La Mirada or Tile Roofing in La Mirada while a contractor is already there. If your home sits near Biola University or in the older blocks off La Mirada Boulevard, we cover the whole city – see La Mirada for the areas we work.
Serving La Mirada, CA – Our Local Coverage Area
We serve La Mirada and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Tub-to-Shower Conversion in La Mirada

A typical conversion takes 5 to 10 working days from demo to final walkthrough, with most La Mirada homes finishing around day 8. Add a day if plumbing has to be rerouted or you add a bench. We schedule the whole sequence up front so you know when your bathroom is back in service.
You need a permit when the drain or water lines move or the valve changes, which is most conversions. A straight swap in the same alcove sometimes skips a permit, but La Mirada’s older plumbing usually needs rework. We pull the permit and pass the inspection as part of the job.
Yes – if the new shower sits in the same alcove at the same drain location, we can often keep the rough-in and just rebuild the pan and surround. A curbless entry or a wider opening is where framing and plumbing changes come in. We’ll tell you which one your bathroom allows at the estimate.
Most jobs run $3,500 to $10,000, with the sweet spot around $6,000 – $8,000 for a tiled shower with a glass door. The variables are size, existing plumbing condition, and material grade. Call (888) 255-8179 for an exact quote – estimates are free.
Every conversion is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it applies to the pan, the waterproofing, the tile and the install, not just the parts.
Get a Free Estimate on Your Tub-to-Shower Conversion
Call (888) 255-8179 for a free on-site estimate on your tub-to-shower conversion in La Mirada. A live person answers, day or night. We’ll look at the alcove, check the plumbing, and give you a written line-item quote before anything is ordered. If the job is part of a wider scope, our Bathroom Remodeling service covers it from start to finish. $1,000 off projects over $10,000 and 0% financing for 18 months are available.