Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Concrete Driveways & Concrete Work in Pico Rivera, CA: What It Costs and How Long It Runs
A concrete driveway or flatwork pour in Pico Rivera typically lands between $4,500 and $12,000 for a standard two-car driveway, and a full replacement runs $5,000 to $14,000. Most driveways are demoed, formed, poured and finished in three to five working days, then cured for about a week before you park on them. Call (888) 255-8179 and we’ll walk your apron and slope and put a firm number in writing.
Key takeaways: the price you see is the number you pay, permits get pulled before anyone digs, most jobs are done in a single visit cycle, and the finished pour is covered by our 730-Day Done Right Promise.
How a Concrete Driveway Goes In, Step by Step

Concrete isn’t a same-day product. What you’re buying is the sequence, and the sequence is where driveways fail or hold for thirty years. Here’s exactly what happens on a Pico Rivera pour.
Day 1: Walk, measure, and decide the spec
Before we cut anything, we measure the driveway width against your garage door opening, check where the apron meets the street gutter, and look at the slope toward your garage. You decide the finish (broom, exposed aggregate, salt-and-pepper), the color, and the joint layout. If the old slab sits over undocumented fill, we flag it now, not after the pour.
Day 2 – 3: Demo, haul-off, and base prep
We break out the old concrete, load it, and grade the subgrade to the right fall away from the house. Class II base gets compacted in lifts, usually 4 to 6 inches for a residential drive, deeper over soft spots. Grading is not glamorous and it’s the single biggest driver of whether cracks show up in year three.
Day 3: Forms, rebar, and inspection
Forms go up, #3 or #4 rebar gets set on chairs at roughly 18 to 24 inches on center, and we call the inspection if your job requires a permit. We don’t pour a driveway that hasn’t passed form inspection, full stop. You don’t have to be home for this, but we’ll text you when it clears.
Day 4: Pour and finish
We order the mix, typically 4 to 5 inches thick for a residential drive and 6 inches at the apron, place it, screed it, float it, and cut control joints at the right spacing so the cracks happen where we want them. Finish takes an hour or two depending on the weather.
Day 4 – 11: Cure and backfill
You keep cars off for about seven days and heavy trucks off longer. We come back to strip forms, clean joints, and touch up edges. If the job ties into a new detached garage slab for a New Detached ADU in Pico Rivera, the concrete schedule gets sequenced against that pour.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Concrete Choices You’ll Actually Make
No two driveways are the same recipe. Here’s what moves the result, and what each choice costs you in dollars and durability.
- Standard broom finish: the default. Grippy, hides imperfections, cheapest finish, holds up well in our summer sun. Good pick if the driveway gets heavy use and you’re not chasing a look.
- Exposed aggregate: pea gravel is broadcast into the surface and the top paste is washed off. More texture, slightly more slip resistance, adds roughly $2 to $4 per square foot. Holds color better than stamped work under UV.
- Salt-and-pepper or colored concrete: integral color mixed into the pour, not painted on. Adds a modest premium and doesn’t chip off the way surface stains can.
- Thickness and rebar: 4 inches with welded wire mesh is the budget spec; 5 to 6 inches with #4 rebar at 18 inches on center is what we recommend for anything taking an SUV or a work truck. The upgrade typically adds 8 to 15 percent to the pour and is the cheapest insurance you’ll ever buy.
- Drainage and slope: a driveway that sheds toward the garage is a wet garage. We set the fall to the street, and where that isn’t possible we spec a channel drain. This can swing the job $400 to $1,200 depending on how much trenching and concrete cutting it requires.
- Joint layout and saw cuts: a good joint plan looks intentional and controls cracking. It’s included; a bad one isn’t something you fix later without a saw and a day of dust.
Materials matter too. We spec the mix design and finish with the same care we bring to a Kohler or Delta fixture in a bathroom. The concrete is the part of your property nobody notices until it cracks.
What Concrete Driveways & Concrete Work Costs in Pico Rivera, CA

A standard concrete driveway installation runs $4,500 to $12,000. A full replacement, including demo and haul-off, is $5,000 to $14,000. Smaller flatwork like a walkway or a patio slab is quoted on a square-foot basis pricing from $10 to $18 per square foot installed.
The variables that push a job from the low end to the high end:
- Square footage: a single-car apron is nearly half the cost of a two-car drive. This is the biggest lever.
- Existing slab condition: thick old concrete, rebar, or a slab poured over brick hardcore takes more demo time and more haul-off.
- Base and subgrade: soft soil or an undocumented old fill layer means excavation and imported base, and that runs $800 to $2,500 extra.
- Drainage work: channel drains, trenching, and tie-ins to the storm system add real money.
- Finish grade: broom is standard, aggregate and stamped carry a premium.
- Permit scope: a driveway that encroaches into the public right-of-way or changes grading needs a permit and inspection, and that adds a few hundred dollars and roughly a week to the schedule.
Our written estimate breaks the job into line items: demo, haul-off, base, rebar, concrete, finish, permit, and clean-up. What’s typically excluded is landscaping repair adjacent to the driveway, fence relocation, and any underground utility relocation if something surprising turns up. We don’t hand you a number and change it later. Upfront pricing, no surprises. Call (888) 255-8179 for an exact quote on your Pico Rivera driveway; estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Pico Rivera Homes Specifically Do to This Job
Pico Rivera is a built-out, post-war working-class suburb. Most single-family homes here went up in the 1950s and ’60s, so concrete work is nearly always replacement, not new construction. That matters because the old slabs we pull out of these yards were often poured thin, without rebar, and over whatever fill the builder had on hand. We size rebar and base for what the original slab missed.
Homeowners here tend to stay for decades, which changes the calculus on a driveway. You’re not pouring for resale. You’re pouring for the next twenty years of kids, work trucks, and summer heat. Our July and August heat inland dries the surface fast, so we adjust mix water and finishing timing to prevent plastic shrinkage cracks before they start. When winter rains come, the driveways that fail are the ones that never had proper slope to the street, and that’s fixable in the plan.
Many projects here are owner-occupied remodels and garage conversions, and contractors regularly navigate older LA County codes and pull permits for remodels rather than new builds. If your project grows into an Garage Conversion ADU in Pico Rivera, the driveway becomes the access route, and we plan the pour around that. For the wider project picture, including pavers and patios, see our Driveway & Pavers service, or the city-specific page for Driveway & Pavers in Pico Rivera. We serve Pico Rivera across all three ZIP codes, 90660, 90661, and 90662, and we work the neighborhoods along Rosemead Boulevard and Whittier Boulevard regularly.
Serving Pico Rivera, CA – Our Local Coverage Area
We serve Pico Rivera and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Concrete Driveways & Concrete Work in Pico Rivera

Plan on three to five working days for demo through the final pour, then about seven days of cure before you park on it. Permit review can add a week if the job touches the right-of-way or grading. Call (888) 255-8179 and we’ll give you a date range in writing with your estimate.
Usually yes if the work touches the public sidewalk, apron, or changes grading and drainage onto the street. A straight replacement within your own property often doesn’t require one. We pull the permit and handle the inspection when it applies – you don’t have to chase the city. Call (888) 255-8179 to check your specific address.
Installation runs $4,500 to $12,000, and a full replacement with demo is $5,000 to $14,000. Whether you’re at the low or high end depends on square footage, base condition, drainage, and finish. Call (888) 255-8179 for an exact number on your driveway.
Yes, in most cases. We pour up to garage aprons, fences, and footings without disturbing them, and we plan around buried gas, water, and electrical lines after we mark them. If a utility sits where the new slab needs to go, we tell you before we quote. Call (888) 255-8179 and we’ll talk through your layout.
Every pour is covered by our 730-Day Done Right Promise – if the workmanship doesn’t hold, we come back and make it right. That covers our forming, base prep, and finishing. Concrete materials themselves carry a standard supplier warranty. Call (888) 255-8179 to get a written copy with your estimate.
Get a Free Estimate on Your Pico Rivera Driveway
Call (888) 255-8179 for a free on-site estimate. We’ll measure the drive, check slope and base, and hand you a line-item written quote with the permit scope named. Calls are answered by a live person, 24/7, so there’s no voicemail to wait on. Most jobs are scheduled within a week or two of the estimate. And with $1,000 off projects over $10,000 plus 0% financing for 18 months, a full driveway replacement fits more budgets than you might expect.
Written by the team at Groundwork Construction Co.