







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Cerritos, CA: What the Job Really Involves
A full kitchen remodeling in Cerritos usually means a down-to-the-studs rebuild of one room, and the honest number is $14,000 to $45,000, most often landing between $22,000 and $34,000 for a 1960s or 70s tract kitchen. Plan on six to ten weeks from demo day to final inspection. Call (888) 255-8179 to schedule a free on-site estimate, and we’ll walk your Cerritos kitchen with you before anyone quotes a number.
The Cerritos kitchen we open up is almost always a 50-year-old one

Cerritos is a fully built-out, master-planned city. Nearly every lot here was developed between the late 1960s and the 1990s under planned-unit-development standards, which means there’s no vacant land to build on. Every kitchen we work on in 90703 is a remodel of a house that’s already standing, and most still carry the original cabinet boxes, the original single-gang wiring, and the original plumbing runs. That changes the job. A kitchen remodel in a newer city is mostly cosmetic, ours is part surgery, and the permit path through the city is one of the tighter ones in the area.
Here’s what that means when you’re comparing bids on Full Kitchen Remodeling in Cerritos: a contractor from Norwalk or Bellflower who quotes off a cookie-cutter checklist will miss the panel capacity question, the galvanized supply lines behind the sink wall, and the architectural review piece. We don’t. Every estimate we hand you starts with a walk-through that checks all three before a single number gets written.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
What to look for in a Full Kitchen Remodeling bid in Cerritos
Most homeowners here get two or three quotes and can’t tell them apart. The difference is almost never the total. It’s what’s inside the total. When you’re comparing Full Kitchen Remodeling proposals in Cerritos, check these four things line by line:
- Is there a line item for permits and inspections? A bid without one is a bid that will grow. Cerritos pulls permits and inspects the rough work before drywall goes back up, and that line item should be visible and priced.
- Is the electrical panel and plumbing condition written down? Original wiring in some 1960s to 70s builds won’t support a modern kitchen’s load. A real estimate acknowledges that up front or states the assumption in writing.
- Is the material grade named? “Quartz countertops” means nothing. The brand, the thickness and the edge profile do. KraftMaid and Cambria sit in our portfolio because the specs are clear and the lead times are predictable.
- Is the warranty in writing, and how long? Ours is the 730-Day Done Right Promise: if it’s not done right, we make it right. Any bid you’re comparing against should state its workmanship warranty in writing.
That’s also where a written, line-item estimate beats a lump sum every time. Upfront pricing, no surprises means you can read the bid, not just trust it.
How we actually run a Full Kitchen Remodeling project

Here’s the real sequence, start to finish. These durations are what we hold ourselves to on a typical Cerritos kitchen.
Stage 1: Walk-through and scope, days 1 to 3
We measure the room, open the panel, check the supply lines and look at the subfloor. You decide: the layout, whether the sink and range stay put or move, and the material tier you’re working in. This is where the number locks in before demo starts.
Stage 2: Permits and ordering, weeks 1 to 3
We pull the permits through the city and order the cabinets, countertop slab and appliances, because those have lead times and they gate everything else. You decide: door style, finish, countertop edge, and appliance package. Cabinets typically run 3 to 6 weeks.
Stage 3: Demo and rough-in, week 4 or 5
One to three days to demo, then the rough work: framing corrections, plumbing relocation, electrical runs, and any HVAC or ventilation work. Then the city inspects the rough before anything closes up. You decide: almost nothing here; this is where you want the decisions already made in stage 2.
Stage 4: Install, weeks 5 to 8
Drywall, tape, texture, paint, cabinets, countertop template and install, tile, trim and fixture set. You decide: the final walk-through punch list. We do a pre-walk before you do, so you’re reviewing a finished product.
Stage 5: Final inspection and handoff, weeks 8 to 10
Final inspection, a full system test, and the walk-through with you. Your 730-Day Done Right Promise starts at handoff, not at demo. Background-checked, uniformed technicians run every stage, and calls are answered by a live person 24/7 if something comes up along the way.
Because the kitchen, bathrooms and flooring all share plumbing and subfloor, this work often overlaps with Kitchen Remodeling in Cerritos if you’re scoping the whole home, or with Full Bathroom Remodeling in Cerritos when the bathroom is on the same plumbing stack. If your existing tub is coming out too, homeowners often pair this with Walk-In Showers & Shower Remodeling in Cerritos to keep one contractor on the whole plumbing scope.
The choices you’ll make between materials and specs
- Cabinets: stock, semi-custom or custom. Stock gets you standard sizes and the quickest timeline. Semi-custom fits your actual kitchen and holds up better over a decade. Custom is for unusual layouts and higher-end finishes. KraftMaid sits in our semi-custom tier for the balance of fit and lead time.
- Countertops: quartz, granite or solid surface. Quartz is non-porous and needs no sealing, which matters in a busy Cerritos household. Granite is durable but needs periodic sealing. Solid surface shows scratches more, refinishes easily. Cambria is in our quartz lineup.
- Sinks and faucets: Kohler, Moen, Blanco or Delta. All four make reliable fixture lines. Pick based on whether you want a workstation sink (more utility, higher cost) or a classic undermount (simpler, cheaper).
- Floors and backsplash: keep them in the material tier you can afford to replace in a decade. Overspending on tile that meets a mid-range cabinet looks worse than matching tiers.
- Layout: same footprint vs moving the sink and range. Staying put is cheaper and keeps permitting simpler. Moving plumbing adds both cost and a second inspection cycle, so it’s worth deciding before you order cabinets.
This is where our Kitchen Remodeling service standards apply: we don’t sell you a material grade that doesn’t fit the room.
See the difference
Before
After
Before
After
Before
AfterWhat Full Kitchen Remodeling costs in Cerritos, CA

For a Full Kitchen Remodeling project in Cerritos, the range is $14,000 to $45,000. That covers everything from a modest refresh of a small tract kitchen to a full custom rebuild with a new layout. Most projects land between $22,000 and $34,000. Here’s the line-item breakdown we use:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full kitchen remodel, all-in | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
What moves a job to the low end: original footprint kept, cabinets and sink in place, standard sem-custom cabinets, quartz at the mid-grade. What pushes it to the high end: relocating the sink and range, a panel upgrade, wall removal or a beam, custom cabinetry, and full appliance replacement. Two contractors can quote the same kitchen $15,000 apart purely on those line items. Ask each one which of them is in the bid.
Every written estimate we hand you lists the scope, the allowances and the lead times. What it doesn’t include: appliances and fixtures you buy separately, any hidden condition discovered behind a wall, or finishing work in adjoining rooms. Those are priced as a change order you approve before anyone touches them. 0% financing for 18 months is available, plus $1,000 off projects over $10,000.
What Cerritos homes specifically do to this job
The city’s permit and design-review process is real, and it’s tighter than neighboring Norwalk or La Mirada. Exterior changes, even repainting schemes and room additions, often need design approval matching the original tract palette. Interior kitchen work stays simpler, but if a wall comes out, the structural piece gets inspected the same way. We pull and manage the permits, and we plan the inspection windows into the schedule upfront.
The housing stock drives the rest. Cerritos tract homes from the 1960s through the 80s often still have original galvanized or early copper plumbing, and some 1960s to 70s builds carry aluminum wiring. The kitchen is where it all converges: a modern induction range or dishwasher on a pantry circuit, supply lines behind a sink wall. We open those up before demo, not during. The inland climate, with hot dry Santa Ana wind events and long dry summers, also stresses the exterior stucco and roof venting around the kitchen, which we check on the same walk-through. If you call about covering Cerritos, we’ll name the specific house era and the risk lines before any quote.
Serving Cerritos, CA – Our Local Coverage Area
We serve Cerritos and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Full Kitchen Remodeling in Cerritos
Six to ten weeks, from demo to final inspection. Cabinet lead time drives most of the timeline, so the more decisions you lock in at the walk-through, the faster the rear half runs. Call (888) 255-8179 for a project-specific timeline after we see the kitchen.
Yes, if the work touches plumbing, electrical, structural or ventilation, which most full remodels here do. We pull the permits and schedule the rough and final inspections through the city. If you’re wondering whether your particular scope qualifies, call us and we’ll tell you straight.
Yes, and it’s often the right call. Keeping the sink, range and island where they sit cuts cost, shortens the timeline and keeps the permit scope simpler. We’ll show you what’s possible on the existing footprint before suggesting anything bigger. Call (888) 255-8179 to talk it through.
It runs $14,000 to $45,000, with most projects landing between $22,000 and $34,000. The variables that push you one way or the other are cabinet tier, whether plumbing or electrical moves, panel upgrades, and wall removals. Call for an exact line-item quote. Estimates are free.
Every project is covered by the 730-Day Done Right Promise. If it’s not done right, we make it right, and the coverage starts at handoff. It’s one of the longest workmanship guarantees in residential construction, and it’s in writing before the first board comes out.
Ready for a free on-site estimate?
Call (888) 255-8179 to book a free Full Kitchen Remodeling estimate in Cerritos. We’ll walk the kitchen, check the panel, plumbing and framing, and leave you with a written, line-item proposal that has real numbers in it. No sales pitch, no guessing. Live person on the line, day or night, and a 730-Day Done Right Promise behind the finished job.
Written by the team at Groundwork Construction Co.












