







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Downey, CA: What the Job Actually Involves
New cabinets and countertops in Downey typically run $14,000 to $45,000 for a full kitchen’s worth of both, and the work takes about 4 to 8 weeks from demolition to the last bead of caulk. Most of that time is waiting on fabrication, not building. If you’re pricing the job and want a real number instead of a ballpark, call (888) 255-8179 and we’ll walk your kitchen and put a written, line-item estimate in your hands.
How the Work Moves From Demo to Final Install

Our technicians have up to 12 years of experience, and the sequence below is roughly how every cabinet and countertop job in Downey runs. Here’s the stage-by-stage picture so you know what’s happening on day 1 versus day 20.
Stage 1: Tear-out and site prep (1 to 2 days)
We pull the old cabinets, disconnect the sink and disposal, and protect the flooring and walls that are staying. This is also the day we open up a small section of wall to confirm what’s behind it. On Downey’s older tracts, that peek often reveals whether you have original galvanized supply lines or the early copper that came later, and it decides a lot of the budget.
Stage 2: Rough-in and corrections (1 to 3 days, longer if we move things)
If you’re relocating the sink, adding a dishwasher circuit, or moving the range, the plumbing and electrical rough-in happens here. This is the stage that expands when a homeowner changes their mind about the layout, so we lock the plan before demo starts. Keep in mind that anything requiring a permit means a Downey inspection before the walls close back up.
Stage 3: Cabinet box installation (2 to 4 days)
Wall cabinets go up first, then bases, then we level and shim the whole run. Downey’s old slab and stem-wall floors are rarely perfectly flat, so shimming is normal here, not a red flag. You’ll finalize door style, finish, and hardware at this point if you haven’t already.
Stage 4: Template and fabrication (7 to 15 days)
Once the cabinet boxes are set, we template the countertops. That template goes to the fabricator, and this is the long wait in the middle of the job. Stone and quartz take longer than laminate or butcher block. Nothing moves until the slabs come back, so plan your temporary kitchen accordingly.
Stage 5: Countertop install, sink, and finish (2 to 3 days)
Countertops set, sink and faucet hook up, and we finish the trim, toe kicks, and any edge details. You sign off on the punch list, and the cabinets and countertops are covered by our 730-Day Done Right Promise. If something isn’t right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Weigh Before We Order Anything
Cabinets and countertops are two different decisions, and homeowners tend to lock the cabinets first because lead times drive the schedule. Here’s the honest trade-off on each.
- Stock cabinets: The fastest and least expensive route. Limited sizes and finishes, but a solid fit for standard kitchens. Best when you’re staying put on the existing layout.
- Semi-custom cabinets: Middle ground. You get more sizes, door styles, and interior options without the full custom price. This is where most Downey homeowners land. Brands like KraftMaid sit in this range.
- Full custom cabinets: Built to your exact dimensions. Highest cost, longest lead time, and worth it when the room is odd-shaped or you want something specific.
- Quartz countertops: Non-porous, low maintenance, consistent pattern. Cambria is a common pick. The trade-off is a higher price per square foot than laminate.
- Granite: Natural variation, heat-resistant, durable. Each slab is unique, so you should see the actual slab before it’s cut.
- Laminate: The budget option. Good durability for the money, but it can’t take a hot pan and seams show over time.
- Butcher block and solid surface: Warm look, repairable surface, but they need more care than quartz or granite.
If the scope grows beyond cabinets and countertops, the wider project scope belongs to Kitchen Remodeling in Downey, and our Kitchen Remodeling service covers the full envelope from demolition to finishes.
What Cabinets & Countertops Costs in Downey, CA

For a full kitchen’s worth of cabinets and countertops in Downey, expect $14,000 to $45,000. A cabinet-only change runs $4,000 to $13,000, and countertops alone land between $2,000 and $6,500. Here’s what moves the number up or down.
- Kitchen size and linear feet: A tight galley in an older Downey ranch might need 18 linear feet of cabinets. A long run in a larger home can push past 30, which adds material and labor fast.
- Condition behind the walls: Original galvanized plumbing, old wiring, or a warped back wall that needs framing correction all add cost. We can’t see it until demo, which is why we walk the kitchen first.
- Moving plumbing or electrical: Relocating a sink or adding an outlet isn’t just labor, it can trigger a permit and inspection.
- Material grade: Stock cabinets and laminate countertops sit at the low end of $14,000. Semi-custom boxes with quartz or granite push the job toward the top of the range.
- Islands and layout changes: An island adds square footage, cabinetry, and often electrical. A bonus, but a real line item.
Written estimates list cabinet lines by name, countertop material and square footage, demo, disposal, and installation labor. They typically don’t include structural repair found after demo, appliance costs, or permit fees unless we’ve priced those in. Our estimates are fixed: the number you see is the number you pay, with no change orders showing up later. We also take $1,000 off projects over $10,000 and offer 0% financing for 18 months.
See the difference
Before
After
Before
After
Before
AfterWhat Downey’s Older Homes Specifically Do to This Job
Downey is a built-out, post-WWII inner-ring suburb, and nearly every cabinet job we run here is a remodel inside a 1940s-to-1960s ranch or Spanish-eclectic tract home, not new construction. That matters because you can’t just set new boxes and call it done. On the older tracts near Furman Park, the cabinet tear-out often uncovers original cast-iron drains and shallow stem-wall conditions, and the plumbing and electrical behind those walls is frequently original. Downey’s plan-check process is built around remodeling existing homes and upgrading older structure, so anything that touches plumbing, electrical, or load-bearing walls means an inspection before close-up. The housing stock has a lot of knob-and-tube-era wiring and aging galvanized lines, so we always plan for a correction budget. The good news: the hot, dry inland summers mean we start early and get the messy stages done before the afternoon heat.
Serving Downey, CA – Our Local Coverage Area
We serve Downey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions

Expect 4 to 8 weeks for a full kitchen, with the middle two weeks usually spent waiting on countertop fabrication. The install stages themselves are fast; the timeline is driven by template, fabrication, and any permit inspections. Call (888) 255-8179 and we’ll scope your kitchen to a realistic date.
Cabinet and countertop swaps that stay in the same footprint usually don’t need a permit. Any change that touches plumbing, electrical, or a load-bearing wall does, and Downey’s plan-check will want to see it. We’ll tell you up front what your job needs before we start.
Yes, and most homeowners do. Keeping the sink, range, and wall positions where they are keeps the job in the lower half of the $14,000 to $45,000 range and shortens the timeline. Moving plumbing is where the budget climbs fastest.
The range is $14,000 to $45,000, with cabinet-only work at $4,000 to $13,000 and countertops at $2,000 to $6,500. The low end is stock cabinets with laminate; the high end is semi-custom boxes with quartz or granite plus layout changes. Call (888) 255-8179 for an exact written quote. Estimates are free.
Every cabinet and countertop job in Downey is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t right, we come back and make it right. All technicians are background-checked and arrive in uniform.
Get a Free Estimate for Your Downey Kitchen
We’d rather price your cabinets and countertops from your actual kitchen than over the phone. Call (888) 255-8179 and a live person answers, day or night. We’ll set a free on-site estimate, walk the layout with you, and hand you a written, line-item quote. If you’re also considering a bathroom refresh, homeowners often pair this with Walk-In Showers & Shower Remodeling in Downey or a Tub-to-Shower Conversion in Downey. We cover Downey and the surrounding area.
Written by the team at Groundwork Construction Co.












