Most concrete driveways in West Whittier-Los Nietos run $4,500 – $12,000 depending on length, thickness, and how much tear-out the old slab needs. A standard 20×20 two-car apron with 4-inch pour, base compaction, and control joints is typically a two-day job once the site is ready; longer ranch-style pulls with a detached workshop slab behind them can stretch to four days. Call (888) 255-8179 for a free on-site estimate.
What the work actually looks like from first cut to final cure

Concrete is unforgiving. You can’t come back next week and fix a bad subgrade, and every stage below has to hold before the next one starts.
Stage 1: Demo and haul-off (day one, four to eight hours)
We break out the existing slab, loading it into a dump trailer as we go. On older West Whittier-Los Nietos properties there’s often a second surprise under the original drive: a layer of river rock, an abandoned oil-stain pit, or a previous homeowner’s rubble fill. We hit it, we quote what it costs to remove, and you decide before we proceed. Expect one load per 300 – 400 square feet of 4-inch concrete.
Stage 2: Subgrade and base (day one or two, three to five hours)
We cut down to grade, compact the soil, then bring in and compact 4 to 6 inches of Class II base. This is where long service drives earn their keep. On a property with a 60-foot run to a detached shop, deflection matters more than on a short city apron, and thin base is exactly why so many lot slabs crack in the first winter.
Stage 3: Forming and any utility work (three to six hours)
You decide two things here: the pour thickness (4 inches for passenger vehicles, 5 to 6 for anything that sees a truck or heavy trailer) and whether you want a widened apron to swing a longer vehicle. If a downspout, gas stub, or irrigation run needs to come through, we sleeve it now. Anything buried under poured concrete stays buried unless you plan for it.
Stage 4: Pour, finish, and control joints (one full day)
The pour goes in early, finished by hand, then control joints are cut to plan for shrink cracking. We use 3,500 to 4,000 PSI mix with air entrainment for our climate’s temperature swings. A broom finish is standard; a light salt or exposed-aggregate finish takes an extra half day and adds to the ticket.
Stage 5: Cure and cure-time protection (three to seven days)
You can walk on it after 24 to 48 hours and drive on it after seven in warm weather. We set up barriers, leave the cure schedule in writing, and schedule the final walkthrough after the seven-day mark. Total project time from demo to drivable is usually 7 to 10 days.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually move the result
Concrete isn’t one product. These are the calls that separate a driveway that lasts 30 years from one that’s cracked at the first hot spell.
- Pour thickness: 4-inch is the standard for cars and light trucks. Step up to 5 or 6 inches for a shop slab or a driveway that sees a dually or a boat trailer. It adds $1 to $3 per square foot, and it’s the cheapest insurance on a heavy-use drive.
- Reinforcement: Fiber mesh is the baseline and covers most residential work. #3 rebar on 18 to 24-inch centers is what we recommend over any drive with a shop or trailer load behind it, and it’s worth the extra cost.
- Base depth: 4 inches is minimum; 6 inches is what we pour where soil is questionable or the grade has been filled. Deeper base typically adds $2 to $4 per square foot on the total.
- Finish: Broom is the budget pick and works fine. Salt finish reads slightly warmer against 1940s stucco. Exposed aggregate hides tire marks and is a popular upgrade on West Whittier-Los Nietos lots where the drive faces a public sidewalk.
- Color and sealer: An integral color adds roughly $1 to $2 per square foot. A curing sealer isn’t for looks alone; it slows moisture loss and reduces the surface checking that our summers can trigger.
What Concrete Driveways & Concrete Work costs in West Whittier-Los Nietos, CA

Concrete driveway installation in West Whittier-Los Nietos runs $4,500 – $12,000 for a standard residential apron. Full driveway replacement, tear-out included, sits at $5,000 – $14,000. A standalone shop or workshop slab behind a detached garage typically lands in the $6,000 – $11,000 range for 400 – 600 square feet. Concrete work like walkway extensions, aprons, and small pads starts around $1,200 and up depending on square footage.
The four things that push a job to the high end:
- Length of the run: A 20×20 city apron and an 80-foot service drive to a back workshop are the same material, but not the same price. Square footage is the single biggest driver.
- What’s under the old slab: Underslab plumbing, rubble fill, or an old footing changes demo time and haul-off cost.
- Utility relocation: Moving a gas line, sewer clean-out, or electrical stub adds $800 to $2,500 depending on scope, and requires coordination with the utility.
- Grade and drainage: A lot that needs a swale, retention, or a slope correction adds engineering and dirt import.
- Finish and thickness: Exposed aggregate, integral color, and 6-inch pours all push the ticket up.
A written estimate lists: square footage, thickness, PSI mix, reinforcement spec, base depth, finish, haul-off, and disposal. What it usually doesn’t include unless you ask: utility relocation, drainage corrections, and any structural work uncovered during demo.
See the difference
Before
After
Before
After
Before
AfterWhat West Whittier-Los Nietos homes specifically do to this job
West Whittier-Los Nietos (ZIP 90606) is unincorporated LA County, which means most driveway and slab work goes through the County building department, not Whittier’s. That matters because plan-check timelines and inspection scheduling differ from the city next door, and the same pour on one side of a street can take a different path than on the other.
The housing stock compounds it. Most properties here are 1940s to 1950s stucco-over-wood-frame on small lots, and a large share have a workshop or an oversized garage added in the 1970s or 1980s. We regularly find that the original slab was poured thin, poured over dirt with no base, or expanded piecemeal without joints. Before we pour new concrete, we reconcile the old work first. That sometimes means tearing out a section the previous owner added without a permit, or re-grading a corner where the original drive was too shallow. It’s rarely a clean new-build scenario; it’s forensic work, and a realistic schedule accounts for the discovery time.
Summer heat is the other local reality. Pours scheduled in July or August need to go in early morning and stay covered, or surface checking sets in. We plan cure schedules around the heat rather than fighting it. If you’re building a detached structure on the property, this job often pairs naturally with a New Detached ADU in West Whittier-Los Nietos, where the approach drive and the ADU slab pour together. Converting an existing garage works similarly and often pairs with Garage Conversion ADU in West Whittier-Los Nietos, where a new apron replaces the old garage pad. When the drive is part of a larger yard plan, see Driveway & Pavers in West Whittier-Los Nietos for the wider project scope, or browse Driveway & Pavers for the full category. We cover West Whittier-Los Nietos and the surrounding areas listed on our West Whittier-Los Nietos page.
Serving West Whittier-Los Nietos, CA – Our Local Coverage Area
We serve West Whittier-Los Nietos and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Concrete Driveways & Concrete Work in West Whittier-Los Nietos

A standard residential driveway takes 7 to 10 days from demo to drivable, with 3 to 4 of those days being cure time you wait out. Plan on: 1 day demo, 1 day grading and base, half a day forming, 1 day pour and finish, then 7 days cure. If we uncover something under the old slab, add 1 to 2 days. Call (888) 255-8179 to schedule a free estimate.
Replacing an existing driveway in kind typically doesn’t require a permit, but any new slab, structural pour, or work that changes drainage toward the street usually does. Because this is unincorporated LA County, you’re dealing with the County, not the city of Whittier. We pull permits and pass inspections on every job that needs them and list permit scope in the estimate.
Concrete driveway installation runs $4,500 – $12,000, and driveway replacement with tear-out runs $5,000 – $14,000. A workshop or shed slab behind the detached garage typically lands $6,000 – $11,000. Variables that push to the high end: longer service drives, underslab surprises, utility relocation, and finish upgrades. Call (888) 255-8179 for an exact quote – estimates are free.
Sometimes yes, sometimes the plumbing has to be rerouted first. On 1950s homes, underslab plumbing often wasn’t sleeved properly, and a new pour over a deteriorating line will fail within a few years. We test, scope, and give you the option before we mobilize. If a reroute is required, it’s listed with its own line item in the estimate.
Every concrete driveway and slab job is covered by our 730-Day Done Right Promise. If a joint opens, a slab settles, or the finish fails inside two years, we come back and make it right. Estimates are free and the price in the quote is the price you pay, with no change orders unless you approve a scope change. Call (888) 255-8179 to get on the schedule.
Free on-site estimates for Concrete Driveways & Concrete Work in West Whittier-Los Nietos
Whether you need a new apron, a workshop slab behind the detached garage, or a full driveway replacement, the next step is a free on-site estimate. Call (888) 255-8179 and a live person will pick up, day or night. We schedule a visit, measure the drive, walk the site with you, and send a written line-item quote so you can see exactly what each stage costs. No surprises after the first cut.
Written by the team at Groundwork Construction Co.