







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in Lakewood, CA: What the Job Actually Involves
Replacing a bathroom vanity, retiling the floor and tub surround, and swapping fixtures in Lakewood, CA runs $9,000 to $28,000 as part of a full bathroom build-out, and the work itself takes six to twelve working days once materials are on site. Most Lakewood homes we open up are 1950s tract houses, so the job is rarely just surface work: old mastic, rotten subfloor near the tub, and galvanized stub-outs usually show up in the first hour of demo. Call (888) 255-8179 for a free on-site estimate.
How We Take a Lakewood Bathroom From Demo to Final Fixtures

The sequence matters here because a 1950s slab-on-grade bathroom has no crawlspace to hide mistakes. Here is the actual order of operations and what you’ll be deciding at each stage.
Stage 1: Demo and discovery (day 1, sometimes day 2)
We pull the old vanity, toilet, and tile, and we open the wall behind the tub valve. On Lakewood tract homes this is where we find out whether the galvanized supply lines have to go and whether the subfloor near the tub flange is soft. You don’t decide anything here; you get a written summary same day if anything outside the original scope shows up. We don’t start work without your sign-off on any addition.
Stage 2: Rough-in and framing (days 2 – 3)
If the vanity is moving, or you’re switching from a single sink to a double, this is when the drain and supply lines get relocated and the wall gets blocked for the new cabinet. You’ll finalize vanity width, sink type, and faucet center spacing before this stage starts, because moving plumbing after tile goes up is a tear-out. Licensed plumbing and electrical work happens here, and any inspection required for the scope gets scheduled now, not later.
Stage 3: Substrate and waterproofing (days 3 – 4)
Cement backer board or a bonded waterproof membrane goes up in the wet areas, and the floor gets leveled before tile. You’ll choose the tile layout (running bond, stacked, herringbone) and grout width at this point. Grout joints under 1/8 inch need a different grout type than wider joints, so this decision has a real cost consequence.
Stage 4: Tile setting and grouting (days 5 – 8)
Floor tile sets first, then wall tile, then grout. Large-format tile (12×24 and up) needs a flatter substrate and takes longer to set than 3×6 subway, so it affects the schedule. We seal natural stone and any porous grout before fixtures go back in. Dense bathrooms need a full day of cure before the vanity is set.
Stage 5: Vanity, countertop, and fixtures (days 9 – 12)
Cabinet set, countertop template and install if it’s stone, then sink, faucet, shower trim, and toilet. You’ll pick the faucet finish, drain style, and any accessories here. Final walkthrough is a slow pass: every valve turned, every drain tested, every tile edge checked. Anything that doesn’t pass gets fixed before we call the job done, and our 730-Day Done Right Promise covers the workmanship for two full years.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for Vanities, Tile & Fixtures
Most homeowners spend more time agonizing over finishes than the structure, so here’s the honest trade-off on each.
- Vanity cabinet construction: plywood box with solid wood face frames (KraftMaid is a common choice) lasts decades and handles a heavy stone top; particleboard or MDF boxes cost less and are fine for a guest bath, but they don’t love a humid shower room.
- Countertop material: quartz (Cambria, for example) is the practical pick for a bathroom because it doesn’t etch from toothpaste or hair dye; natural marble looks better and stains easier; cultured marble is the budget option at half the cost.
- Floor tile: porcelain is the workhorse – it’s dense, handles water, and runs $4 – $12 per square foot for materials. Natural stone (travertine, slate) runs $8 – $20 and needs sealing every year or two.
- Wall tile: ceramic subway is cheap and forgiving; large-format porcelain looks modern but demands a flat wall; glass mosaic is a visual statement and a grout nightmare.
- Fixtures: Kohler and similar brands run $150 – $600 for a faucet, and the finish (chrome vs. brushed nickel vs. matte black) matters more than the brand for longevity.
- Grout: epoxy grout costs more upfront but resists staining and mold far better in a shower than cementitious grout.
What Vanities, Tile & Fixtures Costs in Lakewood, CA

The full range for a vanity, tile, and fixture package in Lakewood is $9,000 – $28,000 as part of a bathroom renovation, with the typical Lakewood job landing around $14,000 – $18,000. Here is what a line-item estimate usually looks like, and what moves the number.
| Line item | Typical range |
|---|---|
| Vanity installation (cabinet + top + sink) | $800 – $3,000 |
| Floor and wall tile (materials + labor) | $3,000 – $9,000 |
| Fixture package (faucets, shower trim, toilet) | $800 – $2,500 |
| Waterproofing and substrate | $600 – $1,800 |
| Plumbing/electrical rough-in (if relocating) | $1,000 – $3,500 |
| Permit and inspection (if scope requires) | Varies with scope |
What pushes a job to the high end: relocating the vanity or toilet (requires opening the slab or re-framing), stone countertops, large-format tile, adding a second sink, replacing galvanized plumbing behind the wall, and structural surprises like a rotten subfloor. What keeps it low: keeping the vanity in the same footprint, tile over existing sound substrate, porcelain instead of stone, and chrome instead of designer finishes.
Every estimate we write is line-item and fixed – the number you see is the number you pay, with no change orders unless you approve new scope. Financing at 0% for 18 months and $1,000 off projects over $10,000 are both available.
See the difference
Before
After
Before
After
Before
AfterWhat Lakewood Homes Specifically Do to This Job
Lakewood is one of America’s original planned post-war suburbs, and nearly all of the 25,000-plus homes here were built between 1950 and 1955 as wood-frame stucco on a concrete slab with attached garages. In ZIP codes 90713, 90714, 90712, and 90715, that means a bathroom vanity job almost always turns into a hidden retrofit: the original cast-iron or galvanized plumbing behind the wall is due for replacement, the slab-on-grade foundation means we can’t drop the drain without cutting concrete, and the 2×4 roof framing leaves little room for a new exhaust fan duct to exit. We see the same failure pattern on nearly every street – tile popping off the shower wall because the 1950s drywall backing absorbed moisture for decades, and cast-iron drains rusting from the inside out. Retrofitting 70-year-old tract housing to modern code without altering the uniform mid-century street face is the whole job in Lakewood, and it’s why we plan for substrate repair and plumbing upgrades in the estimate rather than treating them as surprises.
Serving Lakewood, CA – Our Local Coverage Area
We serve Lakewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Vanities, Tile & Fixtures in Lakewood

Expect six to twelve working days on site for typical work, plus a one- to two-week lead time for materials and any required inspection. Stone countertops add about a week for fabrication and template. Call (888) 255-8179 for a schedule based on your actual scope.
Usually not for a straight cosmetic swap, but yes if you’re relocating plumbing, adding a circuit, or moving a wall. We scope the permit requirements up front and pull what’s required so you’re not stuck with an unpermitted bathroom at resale. Call us with your address and we’ll tell you exactly what’s needed.
Yes, and that’s the lower-cost path. Keeping the vanity footprint and leaving the toilet and shower where they sit means no slab cutting and no plumbing relocation, which can save $2,000 – $4,000. We’ll tell you straight if the existing layout is the smarter choice.
$9,000 to $28,000, with the typical Lakewood package landing around $14,000 – $18,000. The low end is a same-footprint vanity and porcelain tile; the high end involves relocating plumbing, stone counters, and hidden repairs. Call (888) 255-8179 for an exact quote – estimates are free.
Our 730-Day Done Right Promise covers the workmanship for two full years from the day we finish. If tile pops, a fixture leaks, or a joint fails because of installation, we come back and make it right at no charge. Materials carry their own manufacturer warranties on top of that.
Homeowners often pair this with Tile Roofing in Lakewood or Specialty Roofing in Lakewood, and the wider scope sits inside our Bathroom Remodeling in Lakewood page and our Bathroom Remodeling service overview. If you’re anywhere in Lakewood, we cover it.
Get a Free Estimate for Vanities, Tile & Fixtures in Lakewood
Call (888) 255-8179 to schedule a free on-site estimate for your Lakewood bathroom. We’ll measure, check the plumbing behind the wall, and hand you a fixed line-item quote before you commit to anything. A live person answers 24/7, and estimates don’t cost you a thing.
Written by the team at Groundwork Construction Co.












