







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHome Additions & ADU Near You in Downey, CA
We build home additions and ADUs for Downey homeowners who want more space without moving. If you’re searching “home additions & ADU near me,” here’s the short answer: we serve Downey and the surrounding cities, we give free on-site estimates, and you can reach a live person at (888) 255-8179 any hour of the day. Every addition we build is covered by our 730-Day Done Right Promise, so the workmanship is backed in writing long after the last walkthrough.
Downey is full of postwar ranch homes on generous lots, and most of the homeowners who call us aren’t looking to leave. They want a primary suite over the garage, a casita for aging parents, or a detached ADU in the backyard that can help with the mortgage. We build all three, and we do it with upfront pricing and no surprises.

Fast, Local Home Additions & ADU
You’re not calling a call center in another state. When you dial (888) 255-8179, a real person answers 24 hours a day, seven days a week, and we get a project consultant out to your Downey property for a free estimate and design consult. That walkthrough includes measuring your lot, talking through setbacks and square footage, and giving you a straight-number proposal.
Design and permitting is where additions stall with other contractors, and we don’t hide that. In Downey, a typical detached ADU runs through plan check with the city’s building division, and the timeline depends on how complete the submittal is. We put that plan package together for you, keep you updated on where it stands, and set a build schedule once permits clear. From there, our technicians, who have up to 12 years of experience, handle framing, roofing, electrical and finish work under one contract. Most projects are built with our vetted trade partners and brand materials you can actually choose from: Andersen and Marvin windows, James Hardie siding, GAF roofing components, Kohler fixtures.
If you’re planning a smaller conversion, like turning an existing attached garage into living space, that path can move faster than a ground-up build. We’ll tell you honestly which route fits your lot and your budget.
Areas We Cover
Downey is home base for us, and from there we work across the southeast Los Angeles County corridor. That includes Norwalk, Bellflower, Santa Fe Springs, Pico Rivera, West Whittier-Los Nietos, Montebello and Artesia. If you’re not sure whether your address falls in our coverage, just call and ask; it takes a minute to confirm.
Each of these cities has its own zoning quirks, setback rules and ADU allowances, and we plan for those from day one rather than discovering a problem during plan check. To dig deeper into our full addition service, see our page on Home Additions & ADU in Downey, and to learn more about the company overall, visit our home page.
Why Homeowners in Downey Call Us First
- 730-Day Done Right Promise – if it’s not done right, we make it right, one of the longest workmanship guarantees in residential construction.
- Live person, 24/7 – no voicemail, no waiting until Monday to get a question answered.
- Upfront pricing, no surprises – the number you see is the number you pay.
- Background-checked, uniformed technicians on every job.
- 0% financing for 18 months plus $1,000 off projects over $10,000 to make a large addition manageable.
- From foundation to finish line – one contractor, one contract, every trade covered.
What an Addition or ADU Costs in Downey
Prices vary with size, site conditions and finish level, but here’s the line-item picture Downey homeowners ask us for. Every proposal we hand you is itemized, and we don’t invent surprises mid-build.
| Project Type | Typical Range |
|---|---|
| Garage conversion to living space | $55,000 – $95,000 |
| Detached ADU (600-800 sq ft) | $150,000 – $280,000 |
| Primary suite addition | $120,000 – $220,000 |
| Bump-out / small room addition | $45,000 – $85,000 |
| Second-story addition | $200,000+ |
Those figures cover design, permits and construction as a package. The $1,000 off projects over $10,000 and the 0% financing for 18 months both apply to work in this range, so a bigger build doesn’t have to mean a lump-sum hit.

What to Know Before You Build
Ground-up construction and second-story work involve structural framing, roof tie-ins, electrical and gas connections. Those aren’t weekend projects, and we don’t pretend they are. A licensed, insured crew carries the load so your home stays safe and to code. If you have a gas line running to an outdoor kitchen or a new ADU, that work belongs with a trained professional, full stop.
We also plan for what a lot can actually hold. Downey lots vary block to block; some have room for a detached 800-square-foot ADU with a private entrance and parking, others are tighter and push you toward a garage conversion or an attached junior unit. During the free design consult we look at access, drainage and utility routing so the plan matches your property before anyone breaks ground.
Our Brand Partners
Material choices matter on an addition because the structure lives with you for decades. We build with a curated set of partners: KraftMaid and Cambria for cabinetry and counters, GAF and CertainTeed for roofing, Andersen and Pella for doors and windows, James Hardie for siding, Belgard for pavers, and Kohler for fixtures. You pick from real, named options instead of whatever’s on hand.
FAQs
How fast can you start on a home addition or ADU near me?
It depends on two things: when your design and permits clear, and where your project lands in our schedule. We get a consultant to your Downey property for a free estimate right away, and design and permitting typically take the longest stretch before construction begins. Call (888) 255-8179 for a real timeline based on your specific plan.
Do you serve my area near Downey?
If you’re in Downey, Norwalk, Bellflower, Santa Fe Springs, Pico Rivera, West Whittier-Los Nietos, Montebello or Artesia, chances are strong that we do. Call (888) 255-8179 and we’ll confirm your address in a minute.
How much does an ADU cost in Downey?
A detached ADU in Downey typically ranges from roughly $150,000 to $280,000 depending on size and finishes, while a garage conversion can run $55,000 to $95,000. We give upfront, itemized pricing so the number you see is the number you pay, and our 0% financing for 18 months and $1,000 off projects over $10,000 both apply. Call (888) 255-8179 for an exact quote, and estimates are free.
Can you help after hours if I have a question about my project?
Yes. A live person answers our line 24 hours a day, seven days a week, so you never hit voicemail or wait until Monday morning. Evening calls are one of the easy parts of working with us. Reach us anytime at (888) 255-8179.
Is it cheaper to repair a small addition or build new?
It depends on what’s failing. If a previous addition has roof or framing problems, sometimes repair is the smarter spend; if you’re simply outgrowing the space, a fresh build is usually the better investment. We’ll look at your situation honestly and tell you which one makes sense before you commit.
Ready to Build? Call Groundwork
If you’re near Downey and planning an addition or ADU, we’d like to walk your property and give you a straight answer on cost and timeline. Free project estimate and design consult, upfront pricing, the 730-Day Done Right Promise backing every build, and a real person on the line whenever you call. Reach Groundwork Construction Co. of Downey at (888) 255-8179 today.
Written by the team at Groundwork Construction Co. of Downey, serving Downey and nearby areas.
What Our Customers Say
"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."
- Dev Sharma












