A tub-to-shower conversion in Lakewood runs $3,500 to $10,000 and usually takes 5 to 10 working days once materials are on site. That covers tear-out, drain and valve work, waterproofing, a new shower base or tiled pan, walls, and glass. The narrow jobs land near $3,500; the ones that pull a permit for valve relocation and new tile go toward $10,000. Call (888) 255-8179 for a free on-site estimate and a written line-item quote.
- Typical timeline: 1 day demo, 1 day rough plumbing, 2 days waterproofing and tile, 1 day glass and trim.
- What changes the number most: whether the drain moves and what wall finish you pick.
- Same footprint: keeping the tub’s drain location saves real money.
How We Do a Tub-to-Shower Conversion, Stage by Stage

Here’s the honest sequence. These five stages are what separates a job that holds up from one that leaks behind the wall in year three.
Stage 1: Demolition and inspection (day 1)
We pull the tub, the surround, and the valve trim. Once the wall is open, we check what’s actually behind it: the studs, the old drywall or greenboard, the drain and trap, and the condition of the plumbing. In Lakewood’s 1950s tract homes, this is where we commonly find cast-iron or galvanized lines nearing the end of their life or a shower valve from the original build. You see what we find before we decide anything.
Stage 2: Rough plumbing and framing (day 1 to 2)
If the drain needs to move to center the shower, or the valve is being replaced, this is when it happens. We frame any niche or bench and block out for grab bars if you want them. You decide here: keep the drain where the tub had it, or relocate it. Keeping it is cheaper. Moving it means opening the slab, which is a conversation about cost and time.
Stage 3: Waterproofing (day 2 to 3)
We hang cement backer board or a foam tile board, then apply a bonded waterproof membrane with the seams and corners sealed and a pre-sloped shower pan. The pan has to slope to the drain before a single tile goes down. This stage earns no visual reward, and it’s the one that matters most. You don’t have a decision to make here, but you should know what we’re installing.
Stage 4: Tile, base, and trim (day 3 to 5)
Tile on the walls, floor, and curb. You choose the tile size and finish before this stage, because large-format tile changes the layout and the labor. Grout, caulk at the wet joints, and a niche shelf go in after. This is the stretch where it starts looking like a bathroom again.
Stage 5: Glass, fixtures, and walkthrough (day 5 to 10)
Frameless or framed glass, a showerhead and controls, a threshold, and a final clean. Then we walk the job with you, check drainage and slope, test the valve, and hand over the written warranty. Glass is usually the last thing to arrive, which is why we schedule it early.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Most of the decisions happen in one sitting. Here’s what actually separates one conversion from another, with the honest trade-off on each.
- Shower base: a pre-formed acrylic or fiberglass pan is fast, sealed, and forgiving (roughly $400 – $1,200). A tiled pan looks custom and lets you match the floor, but adds labor and a critical slope detail that has to be right.
- Wall finish: ceramic tile is the everyday choice and holds up well. Porcelain is denser and tighter but costs more per square foot. Large-format tile means fewer grout lines and more careful substrate work.
- Glass: a framed enclosure runs cheaper. Frameless glass opens the room and reads cleaner but costs more and demands more precise wall alignment, which older Lakewood framing rarely gives us for free.
- Valve and fixtures: replacing the mixing valve while the wall is open is the smart money. It’s the one part you can’t easily get to again without opening the shower.
- Grab bars and bench: a built-in bench suits anyone thinking about aging in place.
Tub-to-Shower Conversion Costs in Lakewood, CA

Expect $3,500 to $10,000 for a tub-to-shower conversion in Lakewood, with most jobs landing in the $5,000 – $8,000 range. Here’s a line-item view:
| Item | Typical range |
|---|---|
| Tear-out and haul-away | $400 – $900 |
| Drain and valve plumbing | $600 – $2,000 |
| Waterproofing and backer board | $500 – $1,400 |
| Shower base (acrylic or tiled pan) | $400 – $1,600 |
| Wall and floor tile | $1,200 – $3,500 |
| Glass | $600 – $2,000 |
| Fixtures and trim | $200 – $800 |
| Total | $3,500 – $10,000 |
Four things push a job to the low end or the high end:
- Drain location. Keeping the tub’s drain is the biggest savings. Moving it means cutting the slab.
- What’s behind the wall. A failing valve or rusted line adds real cost. Original 1950s plumbing is the usual culprit in Lakewood.
- Material grade. Acrylic and ceramic stay modest. Porcelain, large-format tile, and frameless glass push toward the top.
- Permit scope. A straight swap may not need one; relocating plumbing and changing the valve often does, and that adds inspection time and a fee.
The written estimate includes demo, materials you’ve selected, labor, waterproofing, and cleanup. It typically does not include glass if you choose a custom size, any unexpected plumbing repair found during demo, or slab work if the drain moves. We price those up front, so you know before we start. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Lakewood Homes Specifically Do to This Job
Lakewood is one of America’s first planned suburbs, built almost entirely between 1950 and 1955. Nearly every home is a single-story wood-frame tract house on a concrete slab, roughly three bedrooms and one bath, around 1,100 square feet. That build era shapes a conversion in ways that don’t show up in newer cities.
The plumbing is the big one. Most of these homes still have cast-iron or galvanized lines, and the original shower valve. When we open the wall on a conversion in a tract off South Street or around Mayfair Park, the honest odds are that the valve or a section of drain is past its service life. Handling it now is the whole reason to open the wall. The slab is easy to work around if the drain stays put; cutting it to relocate is where a simple conversion turns into a bigger job.
On permits: we check with the city and pull what the scope requires, then schedule inspection, so you’re not left with an unpermitted shower when you sell. Lakewood’s uniform mid-century streetscape gives this city its character, and that means our work stays clean and code-correct so the house fits the block. If the wider project comes up, say pairing a new shower with fresh flooring or a vanity, that’s part of a full Bathroom Remodeling in Lakewood, and our crew handles both. Homeowners in Bellflower and Cerritos often ask about the same work, and we cover Lakewood and the surrounding area the same way.
Serving Lakewood, CA – Our Local Coverage Area
We serve Lakewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Lakewood

A tub-to-shower conversion in Lakewood takes 5 to 10 working days from demo to final walkthrough, assuming materials are on site. Glass delivery is the usual source of delay, so we order it early. Call (888) 255-8179 for a schedule based on your exact bathroom.
Often yes, if the scope moves the drain, replaces the valve, or changes any plumbing or electrical. A like-for-like tile and fixture swap may not require one. We confirm the requirement with the city before work starts, pull the permit, and schedule the inspection so your shower passes. Call (888) 255-8179 and we’ll walk through your scope.
Yes, in most cases. If the tub’s drain sits roughly where the new shower drain should be, we build the shower pan over the existing slab and leave the plumbing and framing untouched. That’s the lower-cost path and the one we recommend when it works. Call (888) 255-8179 for an on-site check of your drain location.
A tub-to-shower conversion in Lakewood ranges from $3,500 to $10,000, with most jobs in the $5,000 – $8,000 range. Drain location, hidden plumbing condition, tile and glass grade, and permit scope drive the final figure. Call (888) 255-8179 for an exact quote, free of charge.
Every conversion is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. We also stand behind the waterproofing and tile work with a written warranty you keep. Call (888) 255-8179 and we’ll send the details before you commit.
Get a Free Tub-to-Shower Conversion Estimate in Lakewood
We come out, measure your bathroom, look at what’s behind the tub wall, and give you a written tub-to-shower conversion estimate in Lakewood with line items and a timeline. No pressure, no vague numbers, just the scope and the price. Calls are answered by a live person, 24/7, at (888) 255-8179. Estimates are free, and we’ll tell you honestly whether your drain can stay put.
Written by the team at Groundwork Construction Co.