







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tub-to-Shower Conversion in Artesia: What It Costs and How Long It Takes
Tub-to-Shower Conversion in Artesia runs $3,500 – $10,000 depending on shower size, whether we move the drain, and the wall and valve package you choose. A straightforward swap on an existing 60-inch alcove usually takes 5 to 8 working days from demo to final walkthrough. For an exact number on your bathroom, call (888) 255-8179 and we’ll set a free on-site estimate. We’re a licensed and insured contractor, and every job we turn over carries the 730-Day Done Right Promise.
How a Tub-to-Shower Conversion Actually Runs, Day by Day

Nobody wants a surprise on day three, so here’s the sequence we follow. It’s the same whether your tub sits in a 1950s tract alcove near the Cerritos border or in a townhome off Pioneer Boulevard.
Stage 1: Walkthrough and scope (day 1). We look at what’s behind the tub: valve type, drain location, whether the wall is drywall or mortar bed, and whether the framing is sound. This is where you decide whether we keep the existing plumbing layout or shift it. Most Alcove In Artesia homes keep it and save $800 – $1,500 in plumbing work.
Stage 2: Demo and rough-in (days 2 – 3). Out comes the tub and surround. We inspect the valve, replace the drain pan, and check the framing for soft spots. If you’re switching from a tub filler to a shower-only valve, that happens now. You’ll pick your shower valve finish from a curated brand set during this stage, so it’s ready when the walls close back up.
Stage 3: Waterproofing and inspection. We install cement board with a bonded waterproofing membrane. If your permit requires a mid-project inspection (most Artesia conversions with a shower pan do), we schedule and pass it before tile goes up. This is the stage we never rush.
Stage 4: Tile, pan, and trim (days 4 – 7). Tile walls, a shower pan (tiled or manufactured), glass or curtain configuration, and fixtures. The homeowner decides tile layout, niche placement, and curb vs curb-less at this point.
Stage 5: Final walkthrough. We run the shower, check slope and drainage, seal grout and caulk, and hand over the written warranty. You get a punch list and a live person to call if anything needs a return visit.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for the Shower
- Acrylic or fiberglass surround: $1,200 – $2,800 installed. Fast, easy to clean, holds up well in a rental or secondary bath. Less visual depth than tile.
- Porcelain tile walls: $2,500 – $5,500 installed. The workhorse for a conversion. Grout lines mean periodic sealing; a quality tile job here lasts decades.
- Natural stone: $4,000 – $8,000 installed. Marble, travertine, or slate. Beautiful and heavy. Needs more frequent sealing.
- Tiled shower pan vs. manufactured pan: a tiled pan is $600 – $1,400 more but lets you control slope and match the wall tile. A manufactured acrylic pan is faster to install and cheaper to replace.
- Frameless glass: $800 – $2,000. The single biggest upgrade to a shower’s perceived quality. Skip it if you’re converting a small secondary bath you plan to sell in a year.
- Valve and trim: a thermostatic valve with a pressure-balancing cartridge is worth the extra $300 – $600 over a basic unit – it prevents the cold-shock-and-scald problem common with older plumbing.
We source from CGI, CWS, and other vetted manufacturers so you’re choosing from proven product lines, not whatever’s in stock.
Tub-to-Shower Conversion Cost in Artesia, CA

Most conversions land between $3,500 and $10,000. A simple acrylic swap on a standard alcove sits near the bottom. Add tile, a new valve, a curb-less pan, and a glass door, and you’re at the top. Here’s what moves the number.
| Line item | Typical range |
|---|---|
| Base conversion (acrylic surround, existing plumbing) | $3,500 – $5,000 |
| Tile walls and tiled shower pan | $5,500 – $8,500 |
| Frameless glass door or panel | $800 – $2,000 |
| Valve, drain, and trim upgrade | $300 – $1,200 |
| Hidden repair: rot, framing, or drain relocation | $500 – $3,000 |
Four variables push a job to the high end: size (a standard 60-inch alcove vs a custom footprint), existing condition (soft framing or failed waterproofing adds days and materials), plumbing and electrical moves (relocating the drain or adding a niche light usually triggers a permit amendment), and material grade (stone and frameless glass are the two biggest line-item jumps).
Your written estimate will be line-item and fixed. The number you see is the number you pay. If you’re also updating the vanity and storage while the room is opened up, our bathroom remodeling service handles the wider scope in the same visit. Call (888) 255-8179 to start the number.
See the difference
Before
After
Before
After
Before
AfterWhat Artesia Homes Do to This Job
Most tub-to-shower work here happens in 1950s – 1960s single-story tract homes on tight parcels, and the city’s plan-check reviews are strict enough that we run every permit submission with careful attention to what’s actually on the plans versus what’s on site. That matters because a lot of these homes have later additions or enclosed patios that were never permitted – and reconciling that is often part of getting the conversion approved. In the ZIPs we cover in Artesia – 90702 and 90701 – a common discovery is a bathroom that was expanded into what used to be a closet or hallway without drawings.
Older homes also mean pre-1978 lead-safe handling if paint or finishes are disturbed, and we plan for that on every job. And because the region’s winter rain bursts tend to find weak points in older plumbing, we pressure-test the drain and check for corrosion before closing walls. If a homeowner is also updating a roof or exterior while the bathroom is torn up, they often pair this with Metal Roofing in Artesia or Tile Roofing in Artesia, since the trades coordinate on the same exterior access.
Serving Artesia, CA – Our Local Coverage Area
We serve Artesia and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in Artesia

Most jobs take 5 to 8 working days from demo to walkthrough. A simple acrylic conversion is closer to 4 days; a tiled shower with a glass door runs 7 to 9. Call (888) 255-8179 to schedule a free estimate and get a specific timeline for your bath.
Yes, in almost all cases. A shower conversion typically involves a shower pan, drain, and waterproofing – all of which trigger a plumbing permit and inspection in the city. We pull the permit, pass inspection, and hand over the paperwork. Call (888) 255-8179 if you’re unsure what your exact scope requires.
Yes, and that’s the most common approach. Keeping the existing drain and valve location saves $800 – $1,500 and avoids most permit complexity. We only move plumbing if you want a different shower footprint or a curb-less entry that requires a relocated drain.
Most conversions in Artesia fall between $3,500 and $10,000. Acrylic showers run near the low end; tile with a frameless glass door and new valve edge toward the high end. Call (888) 255-8179 for an exact quote – estimates are free.
Every job carries the 730-Day Done Right Promise. If a waterproofing failure, a tile defect, or a fixture issue shows up within that window, we make it right at no charge. Our technicians have up to 12 years of experience, and the work is backed in writing.
Get a Free Tub-to-Shower Conversion Estimate in Artesia
We’ll walk your bathroom, measure the alcove, check the valve and drain, and hand you a line-item written estimate before any work starts. If you’re planning a wider refresh, you can see the full scope on our Bathroom Remodeling in Artesia page, and our Bathroom Remodeling service page covers how we run the work. We serve Artesia and the surrounding area. Call (888) 255-8179 to schedule.
Written by the team at Groundwork Construction Co.












