







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What Full Kitchen Remodeling in South Whittier actually involves
Full Kitchen Remodeling in South Whittier means gutting the existing room down to studs and subfloor, then rebuilding it – new cabinets, counters, sink and faucet, flooring, lighting, and paint – and it usually takes 5 to 8 weeks of construction once permits clear. Most South Whittier projects in the 90605 ZIP land between $14,000 and $45,000 depending on size and how far plumbing or wiring has to move. Call (888) 255-8179 and we’ll walk your kitchen and put real numbers on paper.
How the job runs, stage by stage

We don’t hand you a calendar and disappear. Here’s the sequence we follow on a South Whittier kitchen, with roughly how long each stage takes and what you’ll be deciding along the way.
Stage 1 – Design and selections (1-2 weeks, before demolition). We measure the room, confirm what’s staying and what’s moving, and you lock in cabinet layout, door style, countertop material, sink, faucet, and appliance sizes. This is where the money gets set. Changing the countertop from laminate to Cambria after the template is cut means a re-order and a delay, so we push hard to finalize here.
Stage 2 – Permits (2-4 weeks, overlapping design). Because South Whittier is unincorporated, the plan goes to LA County Public Works, not a city building department. We pull the permit and handle the plan check. This is the stage most homeowners underestimate, and it’s the reason a “6-week kitchen” sometimes stretches longer.
Stage 3 – Demolition and rough-in (week 1-2). Day one is protection and teardown: cabinets out, counters out, flooring up, and the room stripped to studs. Then the rough trades come through – electrical, plumbing, and any framing corrections. In these older houses we almost always find something, and we photograph it before it gets covered.
Stage 4 – Inspections and closing the walls (week 2-3). Rough electrical and plumbing get inspected, then insulation, drywall, and the first coat of paint go on. You’ll want to be available for a quick walk-through of outlet and fixture placement right before drywall.
Stage 5 – Finish work (week 3-6, sometimes longer). Cabinets set and leveled, countertop template and install, tile backsplash, flooring, sink and faucet, appliances, trim, paint, and punch list. Cabinet install alone runs several days; countertop fabrication adds a week between template and install. We walk the finished room with you and close out the list before we call it done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
A full kitchen gives you a dozen decisions. These are the ones with the biggest consequence:
- Cabinet construction: Plywood boxes with solid-wood or MDF doors hold up for decades and handle the daily use a busy household throws at them. Particleboard boxes are cheaper and lighter but swell if water ever reaches them. KraftMaid is a brand we specify often because the door and finish options are broad.
- Countertop material: Quartz is non-porous and needs no sealing, which suits a family that doesn’t want maintenance. Granite is durable and unique per slab but needs periodic sealing. Laminate is the budget option and has gotten genuinely better looking. Cambria and similar quartz brands sit at the higher end.
- Backsplash: A simple ceramic or porcelain tile keeps cost low and cleans easily. Glass or a full-height slab is a design statement that costs more and takes more careful install.
- Flooring: Luxury vinyl plank is water-tolerant and forgiving on older, slightly uneven subfloor. Porcelain tile is nearly indestructible but cold and harder underfoot. Engineered hardwood is warm and beautiful but wants a flat, dry subfloor.
- Layout change: Keeping the sink, range, and fridge where they are saves real money on plumbing and electrical. Moving the sink across the room means new drain lines and venting – a meaningful cost jump.
What Full Kitchen Remodeling costs in South Whittier, CA

The realistic range for a full kitchen remodel in South Whittier is $14,000 to $45,000. A compact kitchen with existing layout and mid-grade finishes tends to land near the bottom. A larger room with relocated plumbing, a new island, and premium counters and cabinets pushes toward the top, and can exceed it.
Here’s what moves the number:
- Room size and cabinet linear feet: more cabinets and counters means more material and more labor.
- Layout changes: moving the sink, range, or fridge triggers plumbing and electrical work that a like-for-like swap avoids.
- Existing condition: older wiring, undersized framing, or water damage found during demo all add scope that no honest bid can predict until walls are open.
- Material grade: laminate and stock cabinets versus quartz and semi-custom cabinetry can swing the same room by tens of thousands.
- Permit and inspection scope: structural changes and new electrical circuits widen what gets reviewed.
Your written estimate lists line items – demo, rough trades, cabinets, counters, tile, flooring, paint, permit, and labor – so you can see where the money goes. What it typically excludes: appliance purchases, major structural repairs discovered mid-job, and anything you add after selections are locked. Those get a change order in writing before work proceeds, and the number you signed is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat South Whittier homes specifically do to this job
South Whittier is a post-WWII unincorporated pocket, and most of the kitchens we open here are inside 1940s to 1960s single-story stucco tract houses on 6,000 to 8,000 square foot lots. That build era matters. These homes often carry original two-wire or knob-and-tube electrical and older plumbing, and a full gut remodel is exactly when that gets exposed. We plan for it: upgrading to grounded circuits and replacing aging supply and drain lines while the walls are open costs less now than tearing the room apart again in five years. Where the kitchen sits near an added-on back room, we’ve seen undersized framing behind the drywall, which we correct before cabinets go in. And because the address is unincorporated, the permit runs through LA County Public Works rather than the City of Whittier – a different review path and inspection schedule than a kitchen in neighboring Santa Fe Springs or La Mirada. We handle that paperwork and schedule the inspections so the job keeps moving. If the wider project grows into structural changes, that’s part of a Kitchen Remodeling in South Whittier scope we plan up front.
Serving South Whittier, CA – Our Local Coverage Area
We serve South Whittier and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Full Kitchen Remodeling in South Whittier

Plan on 5 to 8 weeks of construction, plus 2 to 4 weeks for LA County plan review before demo starts. Selections finalized early are the single biggest thing that keeps it on schedule. Call (888) 255-8179 for a timeline built around your specific kitchen.
Yes. A full gut remodel with new electrical, plumbing, or layout changes requires a permit, and in unincorporated South Whittier that runs through LA County Public Works. We pull the permit and manage every inspection. Call us to talk through what your project will require.
Yes, and keeping the sink, range, and fridge in place typically saves thousands by avoiding new lines and venting. It’s the most common way to control budget on a full remodel. Call (888) 255-8179 and we’ll tell you what a layout-keeping kitchen looks like for your home.
Most full kitchen remodels here run $14,000 to $45,000, with the low end for compact rooms with mid-grade finishes and the high end for larger kitchens with relocated plumbing and premium cabinets and counters. Call for an exact written quote – the estimate is free.
Every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. It’s one of the longest workmanship guarantees in residential construction. Call (888) 255-8179 to see it in writing before you commit.
Get a free estimate for your South Whittier kitchen
We’ll come out, measure your kitchen, look at what’s behind the walls as far as we can, and put a line-item estimate in front of you – free, no pressure. If you’re also eyeing the bath while the dust is flying, homeowners often pair this with Full Bathroom Remodeling in South Whittier or Walk-In Showers & Shower Remodeling in South Whittier. You can read more about our Kitchen Remodeling service and about how we cover South Whittier. Call (888) 255-8179 – a live person answers, 24/7.
Written by the team at Groundwork Construction Co.












